Likely an edge case as the static plans are in use as much any more but I want a couple base blocks in and the AI plans for shorter times without an event default to build/specalisation (as noted in my other thread where Eddie is confirming why) so going old school.
In the Win/Android app I can only edit the day not the duration but going via Chrome allows me to sat the durration. Feels like this is an oversight.

