# Link planned event to Zwift synced ride

**URL:** <https://www.trainerroad.com/forum/t/link-planned-event-to-zwift-synced-ride/38378>\
**Category:** TrainerRoad Software\
**Created:** [June 25, 2020, 7:52am UTC](https://www.trainerroad.com/forum/t/link-planned-event-to-zwift-synced-ride/38378 "2020-06-25T07:52:46Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![TwentyOneSpokes](https://sea2.discourse-cdn.com/trainerroad/forum/user_avatar/www.trainerroad.com/twentyonespokes/32/7757_2.png) [@TwentyOneSpokes](https://www.trainerroad.com/forum/u/TwentyOneSpokes)\
**Post date:** [June 25, 2020, 7:52am UTC](https://www.trainerroad.com/forum/t/link-planned-event-to-zwift-synced-ride/38378/1 "2020-06-25T07:52:46Z")

</div>

I inputted a planned race into my training calendar. The race was completed in Zwift and synced to TR via Strava. How do I tell TR that the planned event is that specific synced ride?

Thanks!

---

<div class="post-metadata">

**Author:** ![mcneese.chad](https://sea2.discourse-cdn.com/trainerroad/forum/user_avatar/www.trainerroad.com/mcneese.chad/32/15056_2.png) [@mcneese.chad](https://www.trainerroad.com/forum/u/mcneese.chad)\
**Post date:** [June 25, 2020, 11:44am UTC](https://www.trainerroad.com/forum/t/link-planned-event-to-zwift-synced-ride/38378/2 "2020-06-25T11:44:20Z")

</div>

Open the completed ride in the TR Calendar, then set the Associated workout at the bottom, via dropdown selection.
