# Brick workouts messed within the week

**URL:** <https://www.trainerroad.com/forum/t/brick-workouts-messed-within-the-week/10665>\
**Category:** TrainerRoad Software\
**Created:** [January 28, 2019, 5:53am UTC](https://www.trainerroad.com/forum/t/brick-workouts-messed-within-the-week/10665 "2019-01-28T05:53:20Z")\
**Posts on this page:** 6\
**Page:** 1

<div class="post-metadata">

**Author:** ![joe73](https://avatars.discourse-cdn.com/v4/letter/j/e8c25b/32.png) [@joe73](https://www.trainerroad.com/forum/u/joe73)\
**Post date:** [January 28, 2019, 5:53am UTC](https://www.trainerroad.com/forum/t/brick-workouts-messed-within-the-week/10665/1 "2019-01-28T05:53:20Z")

</div>

I’ve got an issue with OLYMPIC TRIATHLON BUILD, HIGH VOLUME.  
On the calendar, brick workouts (bike&run) are misplaced, split in different days and it takes me a while to setup everything right.

I mean: the bike workout is on tuesday for instance, whereas the correlated off-the-bike run workout is on wednesday. Or the opposite.

Anyone else with the same bug?  
Please fix…

---

<div class="post-metadata">

**Author:** ![Scorpion756](https://sea2.discourse-cdn.com/trainerroad/forum/user_avatar/www.trainerroad.com/scorpion756/32/7746_2.png) [@Scorpion756](https://www.trainerroad.com/forum/u/Scorpion756)\
**Post date:** [January 28, 2019, 4:40pm UTC](https://www.trainerroad.com/forum/t/brick-workouts-messed-within-the-week/10665/2 "2019-01-28T16:40:47Z")

</div>

I just loaded that plan into my calendar and reviewed it. I didn’t see anything like what you’re talking about.

First off, I don’t see any mid-week (Tue or Wed) brick workouts in the plan at all. All the designated bricks are on the weekends.

And as far as I can tell from when I loaded it, every run workout that was labeled as being a component of a brick workout showed up on the correct day in my calendar (i.e. correctly paired with a ride and on the same days as is described in the plans weekly tips notes).

Maybe try deleting the plan from your calendar and reloading it.

---

<div class="post-metadata">

**Author:** ![joe73](https://avatars.discourse-cdn.com/v4/letter/j/e8c25b/32.png) [@joe73](https://www.trainerroad.com/forum/u/joe73)\
**Post date:** [January 28, 2019, 10:38pm UTC](https://www.trainerroad.com/forum/t/brick-workouts-messed-within-the-week/10665/3 "2019-01-28T22:38:37Z")

</div>

I guess my issue happens because, while adding the plan to the calendar, I modified the order/distribution of the single workouts (I did that in order to better fulfil my organisational requirements).  
Maybe those changings to the typical week influenced the whole plan.

---

<div class="post-metadata">

**Author:** ![larry](https://sea2.discourse-cdn.com/trainerroad/forum/user_avatar/www.trainerroad.com/larry/32/12653_2.png) [@larry](https://www.trainerroad.com/forum/u/larry)\
**Post date:** [January 28, 2019, 10:42pm UTC](https://www.trainerroad.com/forum/t/brick-workouts-messed-within-the-week/10665/4 "2019-01-28T22:42:40Z")

</div>

> [@joe73](#):
>
> I guess my issue happens because, while adding the plan to the calendar, I modified the order/distribution of the single workouts

I think that’s exactly what happened. I’d recommend pulling up the original plan in another window or tab, and then using that as a guide to modify your plan so it works for your schedule. It can help a lot to schedule types and intensities of workouts based on what the original plan recommended, just shifted.

---

<div class="post-metadata">

**Author:** ![joe73](https://avatars.discourse-cdn.com/v4/letter/j/e8c25b/32.png) [@joe73](https://www.trainerroad.com/forum/u/joe73)\
**Post date:** [January 31, 2019, 10:54am UTC](https://www.trainerroad.com/forum/t/brick-workouts-messed-within-the-week/10665/5 "2019-01-31T10:54:58Z")

</div>

not very straightforward, but it’s not a big issue. I’ll just re-add the whole plan and make adjustements week by week.

But I just can’t see why the software lets doing something which will mess everything up.

---

<div class="post-metadata">

**Author:** ![AujujuSauce](https://avatars.discourse-cdn.com/v4/letter/a/f0a364/32.png) [@AujujuSauce](https://www.trainerroad.com/forum/u/AujujuSauce)\
**Post date:** [January 31, 2019, 3:28pm UTC](https://www.trainerroad.com/forum/t/brick-workouts-messed-within-the-week/10665/6 "2019-01-31T15:28:03Z")

</div>

If you move full days this shouldn’t happen. I adjusted my HD MV plan by shifting all days up one and everything worked perfectly.
